Quote:
Originally Posted by Flash
This weekend Aug 25th @ 9 am Jeff Mittl will be leading a work party at Stub Stewart State Park. I will be running in the Hood to Coast Relay so I will be missing it.
The team will be working on some Building tasks near holes, 9 10 & 11.
The green of hole 9 needs to be finished with the stairs and platform work to level out the greens.
Hole 10 needs the platform behind the tee box built to allow for a run up on that tee shot.
Hole 10's fairway needs the tiered stairs up the fairway installed.
Hole 11 needs the green leveled and retaining wall built on the backside with stairs exiting the green on the right hand side.
All of these tasks are needed and significantly will improve the play of these holes. Plus these are the fun parts of course maintenance and installation so if you are not playing in the NAAC and want to help make this course better please lend you support to Jeff Mittl on Aug 25th 9 am @ the Hilltop day use area inside Stub Stewart State Park.
|
Come on out to Stub Stewart and give the course some much needed TLC before summer's end! The listed tasks will make Stub more playable especially in the winter months. Please join us this Saturday for 2-3 hours worth of work! Drinks and snacks will be provided!
Hope to see you there!
Thanks,
Jeff