Northwest Disc Golf News Forums

Go Back   Northwest Disc Golf News Forums > Disc Golf Courses > Washington: Southwestern WA > Leverich Park
Register Site Rules FAQ Members List Arcade Mark Forums Read

Reply
 
Thread Tools
  #1  
Old August 16th, 2009, 10:35 AM
fredshoehead
Join Date:
June 11th, 2009
Posts:
1
Default the new cement tee pads suck, kind of...

some of the tee pads at leverich park are WAY too small. you pretty much have no room to wind up and throw on some holes and on most of the new cement pads, theres a HUGE drop off from the edge of the tee pad to the dirt that surrounds it. that has made it very hard for someone like me to get the most out of my tee shot. i have a bad knee, which i'm sure many of us do, and if my foot goes off the edge of the tee and rolls forward, i'm in big trouble. does anyone else have the same gripes???? thanks to whoever put the tees up, but daaaaaang.......
Reply With Quote
  #2  
Old August 16th, 2009, 11:37 AM
Vector_2008
Join Date:
October 28th, 2008
Location:
Willamette Valley, Oregon
Posts:
328
Default

Quote:
Originally Posted by fredshoehead View Post
some of the tee pads at leverich park are WAY too small. you pretty much have no room to wind up and throw on some holes and on most of the new cement pads, theres a HUGE drop off from the edge of the tee pad to the dirt that surrounds it. that has made it very hard for someone like me to get the most out of my tee shot. i have a bad knee, which i'm sure many of us do, and if my foot goes off the edge of the tee and rolls forward, i'm in big trouble. does anyone else have the same gripes???? thanks to whoever put the tees up, but daaaaaang.......
Maybe they, the great volunteers who show up to work parties, are not done yet!

I think they haven't gotten around to back filling around the sides of the concrete yet. Anyone with a shovel could do it. Do you own a shovel? Maybe before you start complaining you should ask, "what is on the course to do list?"

I believe the short ones are a situational thing. The location and the trees don't help; they are on the short holes.

Last edited by Vector_2008; August 16th, 2009 at 11:40 AM. Reason: grammer
Reply With Quote
  #3  
Old August 16th, 2009, 10:02 PM
Brian Heath
Join Date:
August 29th, 2008
Posts:
20
Default

Quote:
Originally Posted by fredshoehead View Post
some of the tee pads at leverich park are WAY too small. you pretty much have no room to wind up and throw on some holes and on most of the new cement pads, theres a HUGE drop off from the edge of the tee pad to the dirt that surrounds it. that has made it very hard for someone like me to get the most out of my tee shot. i have a bad knee, which i'm sure many of us do, and if my foot goes off the edge of the tee and rolls forward, i'm in big trouble. does anyone else have the same gripes???? thanks to whoever put the tees up, but daaaaaang.......
I can understand the concern. There are a couple of things to consider. The first is that they have not finished back filling the pads so that there is a solid landing area. Second, the parks department did have some limitations on the pads. The longer holes however should have plenty of run up, pad space, and a run off or landing area when completely finished. The smaller pads are primarily on the short holes that either don't require much up a run up or are limited by nature as to the size. And I do believe that the smaller pads are still pretty much a standard size on most courses in the area. But I could be wrong.

In a perfect course you would have everything be uniform and perfect size and regulation (is there regulation pad dimensions?) however you have to work with what you got.

I'm sure Steve and company would appreciate any help in getting the pads finished out and continued help on improving the course. You should send him a message.
________________________________________________________________________
__________________________
Brian Heath
My Blog
Member of Stumptown DG #82
Member of PDGA #34367
Reply With Quote
  #4  
Old August 16th, 2009, 10:03 PM
Brian Heath
Join Date:
August 29th, 2008
Posts:
20
Default

oh and I will take smaller pads (as long as there is a good solid landing area) over what was there before any day.
________________________________________________________________________
__________________________
Brian Heath
My Blog
Member of Stumptown DG #82
Member of PDGA #34367
Reply With Quote
  #5  
Old August 17th, 2009, 07:05 AM
Scott
Join Date:
August 28th, 2008
Posts:
4,534
Default

Quote:
Originally Posted by fredshoehead View Post
some of the tee pads at leverich park are WAY too small. you pretty much have no room to wind up and throw on some holes and on most of the new cement pads, theres a HUGE drop off from the edge of the tee pad to the dirt that surrounds it. that has made it very hard for someone like me to get the most out of my tee shot. i have a bad knee, which i'm sure many of us do, and if my foot goes off the edge of the tee and rolls forward, i'm in big trouble. does anyone else have the same gripes???? thanks to whoever put the tees up, but daaaaaang.......
False.

The new pads at Leverich rock. I played them Saturday for the first time and loved 'em. The finish on top is fantastic!
Reply With Quote
  #6  
Old August 17th, 2009, 07:45 AM
gwillim
Join Date:
October 3rd, 2008
Location:
Multnomah Village
Posts:
660
Default

Pads are fine.
Reply With Quote
  #7  
Old August 17th, 2009, 08:23 AM
Eric Olson
Join Date:
August 27th, 2008
Posts:
365
Default

Is the tee for hole 7 finished? I got up there shortly after pads were poured to check it out and it looked like a random pile of dried concrete.
Reply With Quote
  #8  
Old August 17th, 2009, 08:44 AM
gwillim
Join Date:
October 3rd, 2008
Location:
Multnomah Village
Posts:
660
Default

Hole 7's tee is just gravel at the moment. There are a couple of decisions to be made about that and Steve decided to put a temporary gravel tee down until further notice.
Reply With Quote
  #9  
Old August 19th, 2009, 12:46 PM
Wog
Join Date:
September 15th, 2008
Location:
Vancouver, WA
Posts:
496
Default Hole 7 semi-permanent completed

I went out this morning and finished the semi-permanent tee pad for hole 7. We are not 100% sure that the tee pad there will remain there permanently as it is a potential conflict hole with users of the picnic shelter during the summer months. The pad is now 4'x8' cobblestone pavers on a rock base with 2x6 treated boards surrounding the pad. I'll attach a photo for all to see!



P.S. Backfillers are welcome. I took my rake with me today and did some backfilling around tee pad #3, but really hope someone besides myself will step up and do some work at the park. It is getting VERY frustrating to see so many people come out and enjoy the park, but when it comes to doing a little work, very few people are willing.

PROJECTS anyone can help with at Leverich:
  • Backfill tee pads
  • Pick up trash
  • Remove crappy tape someone put on baskets.
  • Pick up cigarette butts littered on course
  • Remove sharpie marking from basket #2
  • Pick up beer cans from around the park
Attached Images
File Type: jpg Tee7.jpg (45.6 KB, 134 views)

Last edited by Wog; August 19th, 2009 at 12:57 PM. Reason: fixed a typo
Reply With Quote
  #10  
Old September 4th, 2009, 01:07 PM
ajinks
Join Date:
September 4th, 2009
Posts:
1
Default

Quote:
Originally Posted by Scott View Post
False.

The new pads at Leverich rock. I played them Saturday for the first time and loved 'em. The finish on top is fantastic!


How did you guys finish the tops of the pads? We're getting some new pads here in Missouri and I'm searching the net for tips and ideas. Thanks!

Andrew
Reply With Quote
  #11  
Old September 4th, 2009, 02:00 PM
Bullseye
Join Date:
August 28th, 2008
Posts:
2,458
Default

Quote:
Originally Posted by ajinks View Post
How did you guys finish the tops of the pads? We're getting some new pads here in Missouri and I'm searching the net for tips and ideas. Thanks!

Andrew
Look for the bright orange plastic fencing used on construction sites. Once you've poured the wet concrete and spread it out evenly, just lay the orange fencing down on top and squeegee it so its flush with the surface. Then carefully lift it off the concrete and finish off the edges.
Reply With Quote
  #12  
Old September 4th, 2009, 04:23 PM
TreeLove
Join Date:
August 27th, 2008
Location:
Portland
Posts:
2,220
Default

DON'T FINISH THE EDGES! All that does is create a slick area right where everyone plants at the front of the pad. Instead, extend your rough surface all the way to the edges.
________________________________________________________________________
Ratings-based divisions: disc golf's inevitable future.
Disc Golf Calendar: www.NWDiscGolf.info, or click CALENDAR at top of page
Submit Event to Calendar: treelove@nwdiscgolf.info
Team Disc Golf: http://www.teamdiscgolf.com
Bitchin' URL: http://www.nwdiscgolf.com

Last edited by TreeLove; September 4th, 2009 at 08:46 PM.
Reply With Quote
  #13  
Old September 4th, 2009, 06:35 PM
Ol' Bob
Join Date:
August 28th, 2008
Location:
Club Mud
Posts:
4,296
Default

What's the cost on that cobbled pad? How well does it work?
________________________________________________________________________
I digress.

The system's not broken...

...it's fixed!
Reply With Quote
  #14  
Old September 4th, 2009, 08:45 PM
TreeLove
Join Date:
August 27th, 2008
Location:
Portland
Posts:
2,220
Default

It's not cobbled, and other than a section of plastic construction fencing, which you reuse, there is no additional cost.
________________________________________________________________________
Ratings-based divisions: disc golf's inevitable future.
Disc Golf Calendar: www.NWDiscGolf.info, or click CALENDAR at top of page
Submit Event to Calendar: treelove@nwdiscgolf.info
Team Disc Golf: http://www.teamdiscgolf.com
Bitchin' URL: http://www.nwdiscgolf.com
Reply With Quote
  #15  
Old September 5th, 2009, 08:09 AM
Ol' Bob
Join Date:
August 28th, 2008
Location:
Club Mud
Posts:
4,296
Default

I was referring to this:
Quote:
Originally Posted by Wog View Post
I went out this morning and finished the semi-permanent tee pad for hole 7. We are not 100% sure that the tee pad there will remain there permanently as it is a potential conflict hole with users of the picnic shelter during the summer months. The pad is now 4'x8' cobblestone pavers on a rock base with 2x6 treated boards surrounding the pad. I'll attach a photo for all to see!

I've tried this using bricks (which I happen to have) and it soon became dangerously slick.
________________________________________________________________________
I digress.

The system's not broken...

...it's fixed!
Reply With Quote
  #16  
Old September 7th, 2009, 02:52 PM
Adam Schneider
Join Date:
August 27th, 2008
Location:
SE Portland
Posts:
3,013
Default

Today, I played Leverich for the first time since the concrete pads went in. I think most of them are fine... except #1, which is definitely too short. It would've been nice if the concrete from #2's pad had been used to lengthen #1's, since #2 barely even needs a pad.


By the way, what's the deal with hole 9.5? Will a tee pad be going in above the creek there?
________________________________________________________________________
Oregon disc golf map
Reply With Quote
  #17  
Old September 7th, 2009, 10:42 PM
Brian Heath
Join Date:
August 29th, 2008
Posts:
20
Default

Quote:
Originally Posted by Adam Schneider View Post
Today, I played Leverich for the first time since the concrete pads went in. I think most of them are fine... except #1, which is definitely too short. It would've been nice if the concrete from #2's pad had been used to lengthen #1's, since #2 barely even needs a pad.


By the way, what's the deal with hole 9.5? Will a tee pad be going in above the creek there?
I definitely see your point about 1, I think once it is built up around it and with a level landing area then it will be much more functional for now it is a bit of a tight fit.
________________________________________________________________________
__________________________
Brian Heath
My Blog
Member of Stumptown DG #82
Member of PDGA #34367
Reply With Quote
  #18  
Old September 30th, 2009, 08:54 PM
Wog
Join Date:
September 15th, 2008
Location:
Vancouver, WA
Posts:
496
Default

Quote:
Originally Posted by Ol' Bob View Post
I was referring to this:
I've tried this using bricks (which I happen to have) and it soon became dangerously slick.
The Cobbled pad is actually 16" square pavers from Lowes. 3 wide by 6 long for a finished size of 4' by 8'. The cost was approximately $5 each so it ended up costing about the same amount. However, I went with this solution because this tee pad hasn't been approved permanently so it will definitely be easier to move later than if we had poured cement. In addition to the pavers there was two bags of sand, a bunch of gravel and 3 8' pressure treated 2x4s used for this tee pad.

We'll see how well they hold up through the winter.
Reply With Quote
  #19  
Old September 30th, 2009, 08:55 PM
Wog
Join Date:
September 15th, 2008
Location:
Vancouver, WA
Posts:
496
Default

Quote:
Originally Posted by Adam Schneider View Post
Today, I played Leverich for the first time since the concrete pads went in. I think most of them are fine... except #1, which is definitely too short. It would've been nice if the concrete from #2's pad had been used to lengthen #1's, since #2 barely even needs a pad.


By the way, what's the deal with hole 9.5? Will a tee pad be going in above the creek there?
9B is a temporary hole for use during tournament play ONLY. Sometimes I forget to remove the basket after a tournament
Reply With Quote
  #20  
Old September 30th, 2009, 09:32 PM
Ol' Bob
Join Date:
August 28th, 2008
Location:
Club Mud
Posts:
4,296
Default

Quote:
Originally Posted by Wog View Post
The Cobbled pad is actually 16" square pavers from Lowes. 3 wide by 6 long for a finished size of 4' by 8'. The cost was approximately $5 each so it ended up costing about the same amount. However, I went with this solution because this tee pad hasn't been approved permanently so it will definitely be easier to move later than if we had poured cement. In addition to the pavers there was two bags of sand, a bunch of gravel and 3 8' pressure treated 2x4s used for this tee pad.

We'll see how well they hold up through the winter.
Thanks for the info.

Yeah, extreme weather could have a real effect on something like that. How the footing now when they're wet?
________________________________________________________________________
I digress.

The system's not broken...

...it's fixed!
Reply With Quote
Reply


Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off


All times are GMT -7. The time now is 07:03 AM.


Powered by vBulletin® Version 3.7.3
Copyright ©2000 - 2013, Jelsoft Enterprises Ltd.