
November 14th, 2011, 11:14 PM
|
Join Date: October 28th, 2008
Location: Willamette Valley, Oregon
Posts: 328
|  |
Keizer DGC Work Party, 19 November 8 am
|
 |
We are going to install 2-3 alt basket locations and some tee signs.
If we have extra people they can do some Tee Pad maintenance or scotch broom pulling. Maybe some tee pad moving also.
We'll need some post hole diggers, shovels and wheel barrows. I have 1 post hole digger and at least one wheel barrow, maybe 2 to use. This would go a lot faster if someone could bring a second post hole digger.
Hope to see some of your smiling faces out there working the course.
|
 |
|
|
|
|
|
|