View Single Post
  #202  
Old November 17th, 2010, 12:13 AM
Gordy #21004
Join Date:
March 31st, 2009
Posts:
603
Default

Quote:
Originally Posted by jshrack View Post
Maybe giving our members input on the planning process would circumvent some of these issues?


Also, was there a work party?
I know I would have gotten my hands dirty if I had heard anything.
These posts are input in the the process and they do carry weight in the process. I read all these posts regularly, respond from time to time, and sometimes make posts of my own. The present body of work at DR regarding pin and pad movement is coming to a close. The improvements for signage, tee surfaces, a putting area and benches will continue. An item that is getting serious consideration for pin placement is an alternate for #1. In a previous post I announced that extra anchors are on the way. An exact spot remains to be chosen.....Other than that there are one or two more hole changes to get done. There is some erosion control to install. Simultaneously similar upgrades for pads , signs and benches are underway at HB. I think Jon is planning a work party for this Sat. at HB. Watch for a post.
Reply With Quote