Thread: Changes?
View Single Post
  #33  
Old October 7th, 2008, 07:10 PM
Brody Cannon
Join Date:
September 2nd, 2008
Location:
Beaverton (Greenway Park)
Posts:
320
Default

Quote:
Originally Posted by Micah View Post
Brody thanks for taking the time to meet with the parks guy, the one hole placement that I would hesitate to agree with you on is hole 9 it sounds like it would make for an easy rhbh hyzer path maybe a placement much farther left next to the proposed stream bank would work well.
I agree but the closer we get to nature/ the stream, the less of a chance to get any change at all. The spot I proposed to the parks guy is about 30 ft from the water. Sorry that my drawing sucks.
Reply With Quote