Quote:
Originally Posted by Timber
Jeff was perfectly clear in his original announcement that his layout work was preliminary, and any final design would have to be approved by the full board.
|
And the design is already on the ground and the Board has not been asked to approve said design at this point. Will concrete go in before the design is approved?