HIGHBRIDGE WORK PARTY Saturday, June 9, 2012 @ 8:30 am Meet at Hole #2's Tee-Box We will be building platforms up to Hole #2's green to aid accessibility and control erosion TOOLS WE WILL NEED Pick-up Trucks Work Gloves Drinking Water Trash Bags Shovels - Spades, Flat & Scoop Rakes - Leaf & Garden Sledge Hammers - Small & Large Cordless Drills Camper Size Generator Wheelbarrows Pry Bars Tampers Tape Measures Levels - 2 ft - 6 ft Call 216-4929 to RSVP or for more info |
is there any hope to fix any of the tee pads that have drop-offs in front of the tee pad? holes 2, 8, 9, 10, 13 (especially 13), 15, 16? they all have ankle breakers at the end of the rubber tee pad.
|
Quote:
|
7KW
The generator will be on the truck.:shooting:
|
thank you
I would like to thank the volunteers that help build the stairs on 2 John, Edger, Dave, Joe, Jerrome, Don, Gordy, Leslie, Jamie. Thank you Jamie for buying burgers for everyone. Thank you Lisa for bring food and Leslie for bring coffee. Thanks everyone for surviving in the rain all day and enduring the wind to help put all those stairs in. There will be more work parties to come at High Bridge and hopefully next time it wont be pouring rain. :biggrin2: :biggrin2: :biggrin2:
|
And thank you for all your efforts and organization to get the job done. It was a pleasure helping out. A job well done !
|
Had fun. glad to be part of a project I have been hoping for a while. Now SDGA member to boot(also been meaning to for a while). Good to meet Joe, Kevin ,John and everyone else. Great to work with Joe and Dave(we did a fair chunk of the 1st run, then they helped with second 2. I put my ocd to good use tamping. :-)
Everyone who showed was way cool and busted their butts in the rain to improve the course. I'll be proud to be able to look at those for years and know I helped. |
Pretty impressive...
The progress a dozen dedicated, positive, cooperative, constructive people can make is just down right amazing. Kevin you did a very fine job as a foreperson getting everyone involved and keeping the tasks moving forward so well. It was HARD work and the rain was misereable...however, I'm so happy I was able to put 3 and a half hours in. My hat is off to the rest of you who worked solid for over 8 hours.
This was a remarkable work party and I can't wait to see the finished product. I'll definitely have a new smile everytime I climb those stairs on hole 2 in the future... Thank you EVERYONE!! P.S. I sent the pictures I took to Bob...and Joe if you did get a pic of me swinging that sledge hammer, you can go ahead and delete it!! :-) |
Unbelievable...
So I cruised by the park last night when I got off work. I couldn't believe how FULL HighBridge was at 7:00 on a Monday night!! I took some photos of the finished steps. I gotta say that it had to be a herculean effort to get the rest of that project done. I left at 1:30 and the upper stairs were marked off but no digging had begun. Did you guys stay there all night?
It looks magnificant!! Truly amazing. I'm so proud I had a small hand in helping out on that project. :bowing: |
Everyone but me went up to those about then. Finished by about 4 or 4:30. Had process worked out so went quicker than 1st 2.
|
Quote:
|
5 Attachment(s)
Working on the lower set of platforms.
http://www.nwdiscgolfnews.com/forum/attachment.php...2&d=1339537151 And staying out of the rain. http://www.nwdiscgolfnews.com/forum/attachment.php...1&d=1339537262 Assembling platforms? http://www.nwdiscgolfnews.com/forum/attachment.php...1&d=1339537490 In the rain. Check out the new SDGA Generator. http://www.nwdiscgolfnews.com/forum/attachment.php...1&d=1339537612 Did we make enough of these things? http://www.nwdiscgolfnews.com/forum/attachment.php...1&d=1339537612 |
5 Attachment(s)
Let's drive these up to the next level.
http://www.nwdiscgolfnews.com/forum/attachment.php...1&d=1339538314 Perfectly laid out. http://www.nwdiscgolfnews.com/forum/attachment.php...1&d=1339538314 Maybe we should go play a hole? http://www.nwdiscgolfnews.com/forum/attachment.php...1&d=1339538314 No the third tier is waiting for us. http://www.nwdiscgolfnews.com/forum/attachment.php...1&d=1339538314 Back filling the second tier. http://www.nwdiscgolfnews.com/forum/attachment.php...1&d=1339538314 |
5 Attachment(s)
Kevin hiking it up the hill.
http://www.nwdiscgolfnews.com/forum/attachment.php...1&d=1339539240 I'm short one of those platforms, where did it go? http://www.nwdiscgolfnews.com/forum/attachment.php...1&d=1339539692 A mini ramp leading to the platforms. http://www.nwdiscgolfnews.com/forum/attachment.php...1&d=1339539240 All it needs is the gravel. http://www.nwdiscgolfnews.com/forum/attachment.php...1&d=1339539240 Wow, it turns half way up! http://www.nwdiscgolfnews.com/forum/attachment.php...1&d=1339539240 |
2 Attachment(s)
Same ramp.
http://www.nwdiscgolfnews.com/forum/attachment.php...1&d=1339540022 We're almost finished. http://www.nwdiscgolfnews.com/forum/attachment.php...1&d=1339540022 Feel free to download any of these attachments. |
I've said it once and I'll say it again. All involved did an awesome job. After 2's steps, what's the next phase of erosion control?
|
That looks amazing! Nice work SDGA and all who helped. Looks so nice I may have guessed the NIDGC did it.:biggrin2:
|
Next up for improvement
Quote:
|
Throw me a rope!
Climb on #9 is the worst, imho, and should be considered for the next attack.
|
On the way
Quote:
I'm emailing the 7 pics I took Monday... Thanks for posting :-) |
| All times are GMT -7. The time now is 04:47 PM. |
Powered by vBulletin® Version 3.7.3
Copyright ©2000 - 2013, Jelsoft Enterprises Ltd.