Vector_2008
April 14th, 2011, 09:10 PM
April is here and it is time to do a work party out at Keizer DGC.
Sunday the 17th of April at 9 a.m. is the date and time.
The priorities for this work party are:
1. Hole 11 - stairs
2. 16-17 stairs
3. 5-6-7 branch/log removal
4. Stairs in front of Tee #2
5. Tee pad maintenance as needed. The pile of 1/4 minus gravel is still there and I like to use that as needed.
Of course we could do much more, but I want to keep the list short and complete these projects first. If we have a lot of people, I am willing to do other stuff.
It will take a dozen people to get these projects completed. We will need the usual tools: shovels, rakes, and wheelbarrows. Plus cordless drills to drill holes in railroad ties.
Hope to see some of you this Sunday!:D
Sunday the 17th of April at 9 a.m. is the date and time.
The priorities for this work party are:
1. Hole 11 - stairs
2. 16-17 stairs
3. 5-6-7 branch/log removal
4. Stairs in front of Tee #2
5. Tee pad maintenance as needed. The pile of 1/4 minus gravel is still there and I like to use that as needed.
Of course we could do much more, but I want to keep the list short and complete these projects first. If we have a lot of people, I am willing to do other stuff.
It will take a dozen people to get these projects completed. We will need the usual tools: shovels, rakes, and wheelbarrows. Plus cordless drills to drill holes in railroad ties.
Hope to see some of you this Sunday!:D